ROWA AG - Headerbild
Logo der Rowa Tunnelling Logistics AG
ATW
Rowa-AG Kontakt

 

Consulting

Consulting for the comprehensive project optimization

Rigid Track, DE

System development study for an efficient low-cost reconstruction of an existing ballasted track (bulk rock bed)  into a non-ballasted track (FF System Bögl) within a short construction period
Study 2008 / 2009

 

Bahntechnik

Hilti Drilling Machine, CH

Contract award for development of 7 automated drilling units using Hilti drilling machines
Study 2008 / 2009

 

Rowa AG - 3D

Rio Tinto TBS und SBS, CA

Rio Tinto mining group requires new technologies in tunneling and shaft sinking for site development of copper mines

Study 2008

 

RioTinto1

Napoli, IT

Feasibility study
Study 2008
 
CTRL1

CEVA, CH

Feasibility study
Study 2007
 
Layout

Abdalajis, ES

Optimization study
Study 2006
M30 Schnellentladung1

SMDK Kölliken LotE, CH

Concept study
Study 2006
  Picture source;SMDK
SMDK1; Quelle SMDK

Nagra, CH

Feasibility study
Study 2006
 
Verfüllgerät1

Rio Tinto Resolution Cooper Mine, CA

Consulting
Study 2005

Download

RioTinto1

Railway infrastructure Gotthard, CH

Feasibility study - Railway infrastructure
Study 2005

Link AlpTransit Gotthard

Bahntechnik

JinPing, CHN

Study Heading installation
Study 2005

Download

jinPing1

DSK Deutsche Steinkohle, DE

AVSA Tunnelling installation
Study 2004

Download

DSK1

Siah Bishe, IN

Feasibilitystudy
Study 2004
 
Siah Bishe1

Parbati III, IN

Feasibility study
Study 2004
 

Nagra, CH

Feasibility study test installation
Study 2003
 

Nagra, CH

Additional study, storage of radioactive waste
Study 2000
 

Nagra, CH

Feasibility study ll
Study 1999
 

Nagra, CH

Feasibility study l
Study 1998
 

Contact

 

Alberto Belloli
Phone +41 55 450 20 30


back