ROWA AG - Headerbild
Logo der Rowa Tunnelling Logistics AG
ATW-Gesamtansicht
LEU Kontakt

 

Rowa has carried out countless logistics systems so far

Transport systems for humans and material.

Carrières d'Arvel, CH

Conveyor belt installations

Year of manufacture 2016

Download

  • Reference sheetPDF 600K

CdA

Brenner Base Tunnel                                 Lot AP164, AT

Rowatrain

Year of manufacture 2016

Download

Rowatrain


TELT - Tunnel Euralpin Lyon Turin, FR

Conveyor belt installations

Year of manufacture 2016

Download

  • Reference sheetPDF 0K

LTF

Brenner Base Tunnel                                 Lot AP164, AT

Conveyor belt installations

Year of manufacture 2015

Download

BBT


TPG, CH

Conveyor belt installations

Year of manufacture 2015

Download

TPG


Power Plant Linth Limmern, CH

Footing elements displacing equipment

Year of manufacture 2013

Download

  • Reference sheetPDF 0K

KLL


Power Plant Linth Limmern, CH

Installation for footing element

Year of manufacture 2012

Download

KLL-Ringschluss


Reitersberg - Bridge over invert construction site, DE

Building of invert tunnel lining during tunnel heading - without interruptions - placement of high volumes of wet concrete without pumping (less additives needed)

Download

Reitersberg


AlpTransit - Gotthard Base Tunnel -  Sedrun, CH

Rail mounted passenger shuttle with electric drive - flexible applicability  - rapid personnel transport in longer tunnels Year of manufacture 2009

Download

Rowa AG - PersonenShuttle


Lake Mead, USA

Mucking system through vertical shaft
Year of manufacture 2009

Download

Lake Mead

AlpTransit - Gotthard Base Tunnel -  Amsteg, CH

Mobile transloading crane for footing elements
Year of manufacture 2008

Download

Amsteg Portalkran

Lovat Moskau, RU

Lining segment magazine and lining segment crane - compact system with extremely short installation and re-assembly time
Year of manufacture 2008

Download

Lovat Moskau

Connections - Weinbergtunnel - Zurich, CH

Turn-key supply and removal facility
Year of manufacture 2008

Download

ATW SBA

PSW Limberg, AT

Anti slip-back system
Year of manufacture 2007

Download

PSW Limberg II

SMDK Kölliken, CH

Transport container sluice
Year of manufacture 2007

Download

SMDK Kölliken

AlpTransit - Gotthard Base Tunnel -   Sedrun, CH

Concrete transport system RoCon Shuttle - the new machine generation after the drum mixer.
Year of manufacture 2007

Download

RoCon Komposition

Water Supply Zurich, CH

Installation for shaft extraction
Year of manufacture 2006

Download

WV Zuerich

AlpTransit - Gotthard Base Tunnel -  Sedrun, CH

Continuous conveyor facility
Year of manufacture 2005

Download

Sedrun SBA

AlpTransit - Gotthard Base Tunnel -  Sedrun, CH

Rotary tippler
Year of manufacture 2005

Download

Sedrun

Wienerwald, AT

Special transport boxes to feed the headings
Year of manufacture 2005

Download

Wienerwald Sohlbetontransport-Behaelter

Wienerwald, AT

Towing switch
Year of manufacture 2005

Download

Wienerwald Schleppweiche

 

 


Katzenberg, DE

Invert concrete installation

Year of manufacture 2005

Download

Katzenberg Sohlbetoneinbauanlage

Langenthal, CH

Crane installation
Year of manufacture2005

Download

Langenthal Längstransportkran

M30, ES

Quick unloading device for lining segments
Year of manufacture 2005

Download

M30 Schnellentladung

Parbati, IN

Rowa offered an innovative, economic solution of a starting ramp for shield TBM in an extremely short time.

Year of manufacture 2005

Download

Parbati

M30, ES

Lining segment magazine for Herrenknecht back-up installation
Year of manufacture 2004

Download

M30 Tuebbingmagazin

Paierdorf, AT

Shaft shield for vertical shaft
Year of manufacture 2004

Download

Paierdorf

Montegiglio, IT

Supply train Climber III
Year of manufacture 2004

Download

MonteGiglio ClimberIII

AlpTransit - Gotthard Base Tunnel -  Amsteg, CH

Monorail
Year of manufacture 2004

Download

Monorail - Amsteg

Premadio, IT

TBM launch device for inclined shaft
Year of manufacture 2002

Download

Premadio Startrampe

CTRL, GB

Segment tippler
Year of manufacture 2002

Download

CTRL Tuebbingdrehstation

Montegiglio, IT

Supply train Climber I
Year of manufacture 2001

Download

MonteGiglio ClimberI

AlpTransit - Lötschberg - Raron, CH

Continuous conveyor
Year of manufacture 2001

Download

Raron SBA

AlpTransit - Lötschberg - Mitholz, CH

Continuous conveyor
Year of manufacture 2000

Download

Mitholz SBA

Girsberg, CH

Continuous conveyor
Year of manufacture 1998

Download

Girsberg SBA

San Bernardino, CH

Transport system
Year of manufacture 1998

Download

San Bernardino

Westerschelde, NL

Lining segment installation
Year of manufacture 1998

Download

Westerschelde TuebbingVersetzkran

Cern, CH

Continuous conveyor
Year of manufacture 1998

Download

Cern SBA

Connecting tunnel - Glatt Zurich, CH

Continuous conveyor
Year of manufacture 1995

Download

Anschlussstollen Zürich-Glatt

Manapouri, NZ

Continuous conveyor
Year of manufacture 1997

Download

Manapouri SBA

Qin Ling, CN

Rotary tippler
Year of manufacture 1996

Download

QinLing Rotationskippe

Mölltal, AT

Spider
Year of manufacture 1995

Download

Moeltall Spider

Riva del Garda, IT

TBM launch device for inclined shaft
Year of manufacture 1991

Download

Premadio

Lesotho, ZA

Rotary tippler
Year of manufacture 1989

Download

Lesotho Rotationskippe

Amlach, AT

Rotary tippler
Year of manufacture 1985

Download

Amlach Rotationskippe


back

Contact

Ask us

Jürg Leuthold will answer your question.
Phone +41 55 450 20 30