ROWA AG - Headerbild
Logo der Rowa Tunnelling Logistics AG
Büro-Layout
HJ Kontakt

 

 


 

From specializes to high performance heading installation - the Rowa installation as key to success

We guarantee that the peak performance of our successive systems would at least be as high as the one of the respective heading equipment.

Rohtang, IN

Application of Alpine tunnelling experience  for highly mechanized conventional heading in the Himalaya

Year of manufacture 2010

Download

Rohtang

AlpTransit - Ceneri Base Tunnel -              Ceneri, CH

Substantial mechanization for 4 conventional main headings at the Ceneri Base Tunnel

Year of manufacture 2010

Download

Ceneri SPV


La Muela II, ES

Highly mechanized heading installation based on entry  from the top
Year of manufacture 2008

Download

La Muela II


AlpTransit - Gotthard Base Tunnel - Sedrun, CH

From specialized to high performance heading installation. The Rowa installation as the key to success.

Year of manufacture 2005

Download

Sedrun VGS

AlpTransit - Gotthard Base Tunnel -  Sedrun, CH

An uncompromising mechanization, also in a conventional heading, increases performance, productivity and safety.

Year of manufacture 2004

Download

Sedrun VTR

AlpTransit - Lötschberg - Mitholz, CH

Rowa has developed a fully mechanized complete system with a logistics concept that caused quite a sensation, in spite of being still widely unknown.
Year of manufacture 2002

Download

Mitholz1

AlpTransit - Lötschberg - Raron, CH

Maximum performance, workplace safety and less personnel
Year of manufacture 2001

Download

Raron

By-pass Flims, CH

Ventilation and supply installation
Year of manufacture 2000

Download

Flims

Vereina Tunnel South, CH

The heart of the high-performance follow-on back-up installation is the 230 m long suspended platform deck.
Year of manufacture 1993

Download

Vereina Sued1

Contact

 

Heinz Jenni
Phone +41 55 450 20 30


back