ROWA AG - Headerbild
Logo der Rowa Tunnelling Logistics AG
Büro2
JW Kontakt

 

Highest Performance and optimized Costs - thanks to a well thought-out Complete System

Investment yield net benefits, due to consistent mechanization and automation - with Rowa safer, more efficient and economic.

Giessbach, CH

Back-up installation

Download

  • Reference sheetPDF 0K

Giessbach

Koralm KAT2 - Deutschlandsberg , AT

2 high-tech TBM back-up installations at work to build the new railway line between Kärnten and Steiermark in Austria

Download

  • Back-upPDF 0K

Koralm KAT2


Innertkirchen , CH

Engineering

 

Layout


Power Plant Linth-Limmern, CH

TBM back-up installation including integrated supply train with hoist and special installation for subsequent construction areas

Download

KLL_LosA1

Metro - Moscow, RU

EPB-Shield back-up installation for repeated short operations in incline tunnels in inner-city environment

Download

Lovat Moskau

AlpTransit - Ceneri Base Tunnel -       Ceneri Access tunnel - Sigirino, CH

Back-up installation adapted to special conditions

Download

Ceneri

Power Plant Sir Adam Beck -  Niagara Falls, Ontario, CAN

Back-up installation for a Robbins Gripper TBM - world's largest diameter, difficult geological conditions

Download

Sir Adam Beck Ontario

By-pass Saas, CH

Back-up installation for Gripper TBM with conveyor belt
Year of manufacture 2005

Download

Umfahrung Saas

ÖBB - Wienerwaldtunnel - Vienna, AT

2 High performance back-up installations achieve peak performance

Download

Wienerwald

Water supply - Liaoning, CN

Back-up installation for Gripper TBM with tunnel belt

Download

Liaoning

AlpTransit - Gotthard Base Tunnel - Amsteg, CH

Up to date best developed high performance back-up installations, including monorail supply trains in tunnel roof and additional installations for the heading of the cross sections

Download

Amsteg

CTRL - Channel Tunnel Rail Link -             London-Eurotunnel, GB

2 TBM back-up installations, running on auxiliary rails including segment backfill system - logistic masterstroke with ongoing train operations in tunnel

Download

CTRL

Rapid Rail Link Guadarrama - Madrid, ES

2 TBM back-up installations for double shield operation with simultaneous segment installation and logistics for maximum peak performance

Download

Guadarrama

Ermenek, TR

Back-up installation for Gripper-TBM
Year of manufacture 2002

Download

Ermenek

Westerschelde, NL

High performance back-up installation
Year of manufacture 2002

Download

Westerschelde

Hydro Power Plant - Manapouri, NZ

Open type hard rock TBM back-up installation for demanding heading works under high occurrence of formation water in New Zealand

Download

Manapouri

Les Vignes, CH

Back-up installation
Year of manufacture 1993

Download

Les Vignes

Vereina Nord, CH

Back-up installation
Year of manufacture 1992

Download

Vereina Nord

Locarno, CH

Back-up installation
Year of manufacture 1990

Download

Locarno

Bözbergtunnel, CH

Back-up installation
Year of manufacture 1989

Download

Boetzberg

Channel Tunnel, GB

Back-up installation
Year of manufacture 1988

Download

Chanel Tunnel

Grauholz, CH

Back-up installation
Year of manufacture 1988

Download

Grauholz

Ärmelkanal Access Tunnel, GB

Back-up installation
Year of manufacture 1986

Freudenstein Lot 1, DE

Back-up installation
Year of manufacture 1986

Paute C, USA

Back-up installation
Year of manufacture 1985

Panix Pressure Gallery, CH

Back-up installation
Year of manufacture 1985

Strada Pressure Gallery, CH

Back-up installation
Year of manufacture 1985

Aten Tunnel, CH

Back-up installation
Year of manufacture 1985

Canaltal Pilot Tunnel, AT

Back-up installation
Year of manufacture 1985

Amlach Lot 5, AT

Back-up installation
Year of manufacture 1985

CERN Lot 3, CH

Back-up installation
Year of manufacture 1985

San Remo, IT

Back-up installation
Year of manufacture 1985


Freudenstein Lot 2, CH

Back-up installation
Year of manufacture 1984

Amlach Lot 3, AT

Back-up installation
Year of manufacture 1984

CERN Lot 1 and Lot 2, CH

Back-up installation
Year of manufacture 1984

Makkah Taif, SA

Back-up installation
Year of manufacture 1983

BAM Sibirien, RU

Back-up installation
Year of manufacture 1982

Mosvik, NO

Back-up installation
Year of manufacture 1982

Tarvisio, IT

Back-up installation
Year of manufacture 1982

Wöllastollen, AT

Back-up installation
Year of manufacture 1981

Hintermuhr, AT

Back-up installation
Year of manufacture 1981

Walgaustollen Lot Bürs, AT

Back-up installation
Year of manufacture 1980

Walgaustollen Lot Beschling, AT

Back-up installation
Year of manufacture 1980

Kerenzertunnel Lot Gäsi, CH

Back-up installation
Year of manufacture 1980

Gubrist, CH

Back-up installation
Year of manufacture 1980

Rwanda, ZA

Back-up installation for connecting tunnel
Year of manufacture 1979

Tunjita Valle, Columbia, ZA

Back-up installation
Year of manufacture 1978

Sölk Steiermark, AT

Back-up installation
Year of manufacture 1978


back


Contact

 

Jost Wenk
Phone +41 55 450 20 30