Westerschelde

Engineering and production of a high-performance back-up system - allowing to keep the tunnel floor free for technical finishing works.

Concept

During realization all required working procedures within the tunnel needed to be analyzed closely so that the installations could be designed according to its actual needs. The result was an innovative back-up concept. The executed solution included following high-lights:

 


 